Amreli Steels Limited (ASTL): 3QFY25 LPS clocked-in at PKR 3.3; LAT of ~PKR 986Mn - By Taurus Research
Apr 30 2025
Taurus Securities
- 3QFY25 LPS: PKR 3.3; LAT: PKR 986Mn, up 12%QoQ
- ASTL’s topline clocked-in at ~PKR 4.1Bn, down 10%QoQ due to drop in long steel volumes amid lower construction demand, Ramadan and Eid Holidays effect. Moreover, lower demand still persists in the long steel segment due to higher construction material cost, higher taxes along with persistent lower capacity utilization. Gross margin hovered at ~2% during 3QFY25. LAT arrived at PKR 986Mn, up 12%QoQ.
- Note: The Company has extended the suspension of its SITE Rolling Mill to six months i.e. until Sep’25. Therefore, ASTL will use 70% capacity to manage the business operations
Current:
Open:
Volume:
Change: ()
High:
Low:
52 Week High:
Vol Avg(12 m):
Free Float:
52 Week Low:
Market Cap:
Total Share:
Relative Strength Index (RSI)
RSI:
MACD Signals
MACD DAILY:
MACD WEEKLY:
Simple Moving Avg (SMA)
SMA(10):
SMA(30):
SMA(60):
SMA(200):
Performance
One Month:
Three Months:
Six Months:
Twelve Months:
Support & Resistance
Support 1:
Resistance 1:
Support 2:
Resistance 2:
High & Lows
Period
High
Low